Thursday, December 17, 2009
Fine Grading
Monday, December 14, 2009
And the rains came...
The weekend rains put quite a bit of water into the streambed. The contractor's crew was wading through water and mud today pumping the water out. Once the water is gone, it will take another couple of days for the streambed to dry out enough to take equipment back in. Hopefully, we won't lose too many more days to rain.
Friday, December 11, 2009
In Spite of the Rain
It's been a rainy week at the Nature Center, but work continues on the stream. Last week I posted a photo of the point bar cobble mock-up. You can see the mock-up in the center-right of this photo. This week the exact location for the cobbles was defined and graded. The cobbles will be about one foot deep, so the slope needs to be lowered by that amount to allow for a smooth transition between the surrounding grade and the cobbles.
The stream grading is almost finished, with just a small area upstream of the south lake remaining. When the muck was dredged out of the stream, the contractor spread it in an unused part of the Nature Center south of Willow Street. The material was turned periodically, enabling it to dry out. The contractor has used that dried out dredge material mixed with clean soil (yes, we tested it) to build up the streambed to the specifications on the plans. The photos below show the big pile of material that was taken out of the streambed in October (left) and what that pile looks like now (right). The woman with the muck in her hand is Jessica Hall from Restoration Design Group.
Tuesday, December 8, 2009
Mocking up the Point Bar
The contractor mocked up a small section of cobbles so we could get an idea of how the point bar area will look. The area will use cobbles that are approximately 6" in diameter, with coarse sand spread between them for stability. The mock-up shown above used materials on hand rather than the materials we want in the final product, so is has road sub-base instead of sand. This worked well enough, but didn't look very good. Even with the larger sub-base material, the field of cobbles was quite stable. The area will be uneven to maintain a natural look, but will be fairly easy to walk on (though not for those in high heels or toddlers just learning to walk).
Friday, December 4, 2009
Field Design
Because the exact condition of the stream could not be determined in advance, this project is being done as a design-build. The contractor is working from 30% construction plans with frequent input from the designers and City staff. Here, the project team is discussing when and how to remove willows that lean over the trail. These willows will be cut where the orange line has been painted across the trunk. The trunks, branches, and leaves will be used for staking and in willow wattles; the root ball will be used for further bank stabilization and to give the stream a more natural look.
Tuesday, December 1, 2009
Surveying

The surveyors are out today, establishing the elevations for the stream from the north lake to the south lake. In concert with the stream restoration consultants, we will determine exactly how much to raise the elevation of the north lake. The decision will balance improving the stream flow with innundating the edges of the north lake.
Entwined No More
On Nov. 5, I posted a photo of a sycamore and pepper tree twisted together and seemingly forming a single hybrid tree. Above is another "before" shot, and below is the same tree today. You can see a small bit of the pepper that was left attached to the sycamore -- to have removed that would have damaged the sycamore unnecessarily. The sycamore is kind of spindly and leggy right now, but it likely will fill out and regain a more healthy shape now that the pepper has been removed and the sycamore has access to light and air.